Telephone:
+86-020-31040276

logo
CONTACT US
  • GuangZhou Huaqin Playground Equipment Co.,Ltd
  • Tel:+86-020-31040276
  • Mail:ftm@cnhuaqin.com

Beijing Nullah Lake City Mission Plaza to celebrate the river through the water to Beijing Ceremony

Published:[2018-07-19 11:07:32]  visits:

Beijing Nullah Lake City Mission Plaza to celebrate the river through the water to Beijing Ceremony


     Two weeks ago, the Danjiangkou reservoir release marks the last 11 years of the beginning of the construction of the North Water Transfer Project through the water. Two weeks later, that is, today, to the north of the river and finally to Beijing. Once through the water, the annual North Water Transfer Project to transport 9.5 billion cubic meters north of the water, the equivalent of 1/6 strip Yellow, simply alleviate severe water shortage situation in the north.
Today, ten o'clock, located in northwest Beijing's Fourth Ring Nullah Lake City Mission Plaza Beijing will host the river through the water ceremony. Does this mean that, in Beijing, people can immediately turn on the tap to drink the water of the Yangtze River do not scale?
Because there is a conditioning tank regiment Lake City, we all know that North Water Diversion from Danjiangkou Reservoir water, there is the starting point, and that is the northernmost end of the conditioning tank regiment Lake City, the conditioning tank storage capacity is 1.6 million cubic meters, storage Sheung Shui in the future through the pipeline can start around the city water supply, water supply loop is North Fifth, East Fifth Ring, South rings, West Fourth Ring Road, the Yangtze River water, the water will flow into the loop of several major water inside Beijing water supply to the city, in the treated water supply for each channel process water and water in the South of Beijing local to share a more than four inputs to the water supply network were to go, of course, Mission Lake City there is a pool of conditioning canal leading to the Miyun Reservoir, that is, after the city water supply to meet the demand of the Yangtze River water to be transferred to other Miyun Reservoir strategic reserve of water, we all know that Beijing is a water shortage in the area, all year round by the exploitation of groundwater to the point so much water in the water is not easy, more water, together also covering groundwater, aquatic ecosystems amended Beijing area. So conditioning Pool Lake City Mission North Water Transfer Project is not only the most northerly end, is still an important hub for the deployment of Water Resources in Beijing.
Conditioning Pool Lake City to take water reservoir supplying water to supply water to water plants, a total area of 67 hectares conditioned pool, is still quite large, but the reporter has learned, and now is not the air conditioning pool, as carried out in advance experimental through the water to the acceptance of the project, the pond has been a part of the water reservoir, so soon in Beijing, people can drink the water of the Yangtze River, to tell you a very simple ideas to determine a home since the water is not the flow of the Yangtze River water find a clean running water pot roast pot of boiling water, the water was opened in the future you see the water inside if base significantly reduced than before, and that was the Yangtze River water to your home and live in the Fengtai, Daxing friends you now on You can take a look at a pot of water to a boil, because 277 residential Fengtai, Daxing, 56.08 million people in the family have been through the two weeks of Danjiangkou water, and this is done in advance Beijing experimental water, but this water not from Mission Lake City over there, from the southwest of Beijing Daning surge Tank supporting projects through the city to the south canal Guogongzhuang water supply. Daning surge tank storage capacity is 9 Lake City Mission conditioning pool, its role is very important, great water pressure upstream runoff, the water flows into the surge tank, the pressure tends to be stable, must reach the level after you can be used with a height difference between Lake City Mission realize artesian water, no pressure then pumping station.
In principle, all of the river in the future to adopt a ratio of 4 is hiding a "yellow water" dangerous, Beijing perennial groundwater use within pipes PH value is relatively stable, and if all of a sudden into the new water, changing the PH value, change the PH value might be some reaction, it is likely to open the faucet and saw how the water is yellow! That which is "yellow water." For this part of the question about the possible experiments have been three or four years. Danjiangkou Reservoir Dam in the midline inside source, a section of the pipe to be spent on Beijing's experiments, sawed through how to share the water what will happen, so there is a transition to a stable future, gradually add the share of the river, held the day before yesterday in Beijing conference on the Beijing Waterworks Group spokesman introduced Guogongzhuang water to test the water for two weeks with all the Danjiangkou water, drinking pure river, there is no showing yellow water phenomenon, so if you press 1 to 4 of this share of the city's water supply, then, "yellow water" would be less dangerous. Square Playground Equipment


Home About us NEWS Products Support Exhibition Video Contact us 中文
Online Message
GuangZhou Huaqin Playground Equipment Co.,Ltd